COMPANY

Profile

Since establishment in 1982, UTEC (UHO TECHNIQUE & ENGINEERING CO., LTD.) has, with its professional knowledge and the quality of its workforce, been engaging in the design, planning, contracting, supervision, testing, and maintenance activities in regard to those projects of PCW, COLD STORAGE & A/C, TEMP & RH CONTROL, and CLEAN ROOM, DRY ROOM, DI WATER, for a variety of industries to make available complete PRO and AFT services. Moreover, by technical exchanges and cooperation with, as well as training from the famous partners, such as Daikin, ECHO, and Cleanair, etc. with a view to fully coordinate with its clients, the Company has selected the optimal hardware & software for, and carried out the projects strictly according to the quality, budget and progress required by its clients. As a result, UTEC has been favorably recognized in the industry.

Along with the trend of international division of work and globalization, the Company set up the Dongguan branch in 1998 and Kunshan branch in 1999, apart from its Kaohsiung Branch, to make available the quicker information and management services to its clients. Further, the Company manufactures the C/R equipment, such as A/S, A/J, T-Grid, HEPA Box, P/B, C/Booth, Clean Bench, etc. at Shengzhen and Wujiang in China, with an attempt to increase the efficiency, cut down the cost, and create a highly competitive operating environment with its counterparts in the industry.

We believe Good Equipment/Components + Good Processing + Good Management = Excellent Performance. We pride ourselves on being quick, efficient, and guaranteed. Let us get the right production environment for you.

Credentials

  • A-Class Membership of Taiwan Refrigeration and Air-Conditioning Engineering Association of ROC
  • Membership of Taiwan Energy Service Association (TESA)
  • ISO 9001:2005 Certificated in HVAC System
  • Construction of Electromechanical Facilities and Environments Project Specialized Contracting Grade 1
  • Architectural Decoration Project Specialized Contracting Grade 2
  • Construction of Electromechanical Facilities Project Specialized Contracting Grade 2
utec mark

Business Scope

  • Clean Room System
  • Dry Room System
  • Food GMP / TQF / HACCP Factory
  • PIC/S GMP & Medical Device GMP Factory
  • Cold Storage, Refrigerated Warehouse and Dock Equipment
  • Explosion-Proof Cold Room
  • Ice Bank System
  • Process Cooling Water System
  • Brine Chilling System
  • Electricity and Auto Control (MCC/FMCS) System
  • DI Water / RO Water / Waste Water System
  • CDA and VA System
  • Scrubber and Exhaust Treatment

History

  • 1982   Establish of Head Office in Taipei
  • 1992   Headquarter Expansion of Business Field
  • 1994   Set-up of Kaohsiung Branch
  • 1998   Set-up of Dongguan Branch
  • 1999   Set-up of Kunshan Branch
  • 2017   Dongguan Branch Expansion of Business Field
locations